| Client |
Brand |
Project Description |
| Bi-water Man Lee Ltd. |
ABS |
Overhaul submersible pump |
| CLP |
APE |
Overhaul ACW Pump #A2A |
| CLP |
APE |
Overhaul ACW Pump #A4 |
| Companhia De Elect De Macau |
|
Recondition mechanical seal |
| DSD-Kwun Tong |
ABS |
Supply & replace mech seal & repair cooling jacket |
| DSD |
ABS |
Overhaul submersible pump |
| DSD-Siu Ho Wan STW |
KSB |
Repair volute by S2 amd supply wear ring |
| DSD |
PUMPEX |
Repair pump shaft at mechanical seal area |
| DSD |
PUMPEX |
Repair KP204 adaptor by S2 |
| DSD-Siu Ho Wan STW |
KSB |
Overhaul submersible pump |
| DSD-Siu Ho Wan STW |
Gilkes |
To trim channel impeller (2 nos.) |
| DSD-Siu Ho Wan STW |
KSB |
Repair volute by S2 amd supply wear ring |
| DSD-Sai Kung STW |
PUMPEX |
Overhaul submersible pump |
| DSD |
|
Modify 2 sets Centrifugal Pump |
| DSD-Siu Ho Wan |
KSB |
Overhaul submersible pump |
| EMSD |
|
Repair Chiller Water Pump No. 1, 2, 3 at R/F. |
| EMSD |
PXPUMPS |
Apply S2 coating for impeller & volute |
| EMSD |
|
Rewind #2 Chilled water pump motor |
| EMSD |
|
Overhaul chilled water pump #1 at B/F |
| EMSD |
HOMA |
Overhaul submersible pump |
| EMSD |
|
Repair DN500 90 Deg Elbow by ARC S2 |
| EMSD |
|
Overhaul seawater pump no.2 |
| EMSD |
|
Apply S2 coating for end suction pump volute |
| EMSD |
|
Repair DN500 90 Deg Elbow by ARC S2 |
| EMSD |
|
Apply S2 coating for end suction pump volute |
| Excelsior Hotel |
|
Overhaul chilled water pump #3 |
| Excelsior Hotel |
|
Overhaul Condense water pump #1 |
| Excelsior Hotel |
|
Overhaul Chilled water pump #2 |
| Excelsior Hotel |
|
Overhaul seawater pump #1 |
| Grand Stanford Hotel |
|
Repair #3 water box end cover |
| HKCEC |
PXPUMPS |
Supply & install #4 submersible pump |
| H.K. Electric |
Zenit |
Apply S2 coating for impeller (4 nos.) |
| IFC Management Co., Ltd. |
|
Supply & install I-beams in seawater pump house No.2, 3 & 5 |
| IFC Management Co., Ltd. |
|
Overhaul seawater pump SWP-5-1 |
| IFC Management Co., Ltd. |
|
Overhaul seawater pump SWP-3-1 |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for new seawater strainer |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for Y-strainer (4 sets) |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for new flange pipe fittings (7 pcs) |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for new flange pipe |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for new flange taper pipe |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for water box end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T9 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T6 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T10 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T4 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T2 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T8 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T7 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for strainer cover #1 |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for strainer cover #2 |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T1 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Repair corroded area for T5 water box & end cover |
| Jardine Engineering Corporation Ltd. |
|
Apply S2 coating for Y-strainer (4 sets) |
| KSH Guardian |
PUMPEX |
Overhaul submersible pump #2 |
| Langham Place Hotel |
|
CHWP-L10M2-01,02,03 - 55kw Chilled water pump x 3 |
| Langham Place Hotel |
|
CWP-L10M2-04,05,06 - 37kw Condense water pump x 3 |
| Langham Place Hotel |
|
CHWP-L10M2-05,06 - 30kw Chilled water pump x 2 |
| MTR |
ABS |
Overhaul submersible pump |
| MTR |
Ritz |
Overhaul Multi-stage cleaning pump CCP-01 |
| MTR |
Ritz |
Overhaul Multi-stage fresh pump CP-02 |
| Realty Cheng |
ABS |
Admin. Bldg. Repair submersible pump no. 1 |
| Realty Cheng |
|
Admin. Bldg. Replacement of control panel and float switch |
| Realty Cheng |
ABS |
Admin. Bldg. Repair submersible pump no. 2 |
| Realty Cheng |
|
Admin. Bldg. Emergency repair of submersible pump |
| Realty Cheng |
|
Repair pump, float switch & control panel |
| Sheraton HK Hotel |
|
Recondition #2 chiller water box end cover |
| Sheraton HK Hotel |
|
Apply S2 coating for end suction pump volute |
| Swire Coca-Cola |
ABS |
Install submersible pump |
| Swire Properties |
|
Apply S2 for duckfoot bend No.2 |
| Swire Properties |
|
Apply S2 for strainer No.7 |
| Swire Properties |
|
Overhaul seawater pump #1 |
| STS-ISS |
PUMPEX |
Repair impeller by ARC S2 |
| Salt Water Supplies Ltd |
|
Overhaul seawater pump #4 |
| Trane Services |
|
Apply S2 coating for #2 chiller water box |
| Trane HK |
|
Apply S2 coating for #1 chiller water box & cover |
| Wenden Engineering Service Co., Ltd. |
Bi-water |
Overhaul submersible pump |
| Wenden Engineering Service Co., Ltd. |
Gilkes |
Overhaul submersible pump |
| Wenden Engineering Service Co., Ltd. |
ABS |
Overhaul vertical column pump |
| Wenden Engineering Service Co., Ltd. |
EIM |
Overhaul submersible pump |
| Wenden Engineering Service Co., Ltd. |
PUMPEX |
Overhaul submersible pump |
| Whampoa Property Management |
Alfa Laval |
#2 Plate Heat Exchanger S2 coating |
| Whampoa Property Management |
Alfa Laval |
#3 Plate Heat Exchanger S2 coating |
| WSD |
ABS |
Overhaul submersible pump |
| WSD |
|
Apply S2 coating for new flange tee |
| WSD |
|
Apply S2 coating for new flange bend |
| WSD |
|
Apply S2 coating for SS strainer (2 nos) |
| WSD |
|
Apply S2 coating for new duckfoot bend |
| Yan Chai Hospital |
|
Repair mech seal gland by ARC 10 and supply 316 S.S. shaft sleeve (2 sets) |